The foundation for safe, reliable immersed tunnels

Our core capabilities

Dry-Docks-Design-engineering

Design engineering

Gina-Omega-Waterstop-with-clamping

Product excellence

Onsite-field-service

Onsite field service

What we do: Securing long-term watertight performance

We Design
Global engineering expertise to support reliable performance from the start
We Manufacture
In-house, state-of-the-art manufacturing for consistent quality at global scale
We Test
Proven performance through rigorous testing before delivery and on the field
We Inspect
Assessment of existing tunnels with clear recommendations to maintain watertight integrity.
We Service
Experienced on-site support to ensure long-term watertight performance
We Validate
Documented, verified work to provide peace of mind and traceability.

Proven across critical tunnel applications

Global references

World-map
Americas
  • Boston Harbour Tunnel – USA
  • Fort Point Channel Tunnel - USA
  • South Boston Piers Transitway – USA
  • Coatzacoalcos Tunnel - Mexico
  • Midtown Tunnel - USA
Europe, Middle East and Africa
  • Coolhaven-tunnel - The Netherlands'
  • Oresund tunnel - Denmark, Sweden
  • Liefkenshoektunnel - Belgium
  • Björvika tunnel - Norway
  • Warnowquerung tunnel - Germany
  • Khor Al Zubair Tunnel - Iraq
Asia
  • Shenzhong Link - China
  • HZMB - Hong Kong Zhuhai Macao
  • Mingzhu Bay - China
  • Foshan Tunnel - China
  • Shatin to Central Immersed Tunnel - China

Featured Video

Featured Resources

Immersed-Tunnel-Sealing-Systems_thumb

Immersed Tunnel Sealing Systems Brochure

Casestudy-Keeping-Immersed-Tunnels-Watertight-for-120-years

Keeping Immersed Tunnels Watertight for 120 years

GME-Discover-a-best-practice-approach-to-sealing-systems

Discover a best-practice approach to sealing systems

ShenZhong-Link-case-study-thumbnail

World's Widest Immersed Tunnel, ShenZhong Link

    
GME-LinkedIn

Stay connected