Benefits
Assist in the transfer of static & dynamic load from the barge transporting the topside to the substructure during float-over operation


Install large platform topside without the use of a heavy lift crane vessel


Full-scale testing compression loads up to 18,300 MT


More cost-effective and reduces installation lead time

Application
Oil & gas topside


Mining and LNG terminal construction


Offshore Wind High Voltage Direct Current (HVDC)


Decommissioning topside