Benefits
Assist in the transfer of static & dynamic load from the barge ferrying the topside structure to the substructure during floatover operation


Install large platform topside structures without the use of a heavy lift crane vessel


Full-scale testing compression loads up to 18,300MT


More cost-effective and reduce installation lead time

Application

Offshore Wind High Voltage Direct Current (HVDC)


Decommissioning structure


Mining and LNG terminal construction

Watch our videos