Seismic Cable Handling - Seismic - Trelleborg Offshore

Seismic Cable Handling

Seismic towed arrays are carefully designed to maximize survey efficiency. To enable the towed array to be set up correctly, it is necessary to attach various buoys, cross chains, etcetera and to ensure the integrity of the towed array, these connection points must provide a secure and safe method of attachment.


Showing 0 of 3 products

Load More

Skelmersdale, UK

Address:Stanley Way, Skelmersdale, Lancashire, WN8 8EA 
Phone: +44 1695 712 000

Show on map