Trelleborg expands its Pipe Seals manufacturing capability in the US

Ribbon cutting in Bonne Terre

Trelleborg expands its Pipe Seals manufacturing capability in the US

Trelleborg’s pipe seals operation inaugurates its manufacturing facility in Bonne Terre, Missouri, in the U.S. The size of the facility has almost doubled with a 17,800 square feet extension, which will allow for increased production and storage of pipe seals.

Rob Brockway, Director of Operations, Trelleborg’s pipe seals operation in Missouri, says: “The water and wastewater industry is increasingly coming under the spotlight as rapid urbanization and rising living standards put pressure on already aging infrastructure. As a result, we have experienced significant growth in the demand for pipe repair products as well as manhole and pipe construction sealing solutions.

“The expansion at the facility will not only allow for increased production rates and improved efficiency, but will also enable us to invest in new, high performance equipment and machinery. The increased inventory, in a location central to the North American market, will help us to deliver an improved service and lead times to customers in the region. Additionally, the extra space will support continued expansion of our production operations. This will allow continued growth in our current products and the capacity to add new products in the future.”

The new facility was officially launched at an opening ceremony (October 26) organized by The St. Francois County Industrial Development Authority (IDA) in partnership with The Southeast Missouri Regional Planning Commission (SEMO RPC). The IDA’s President, Al Sullivan, as well as Kevin Cook, the IDA’s Vice President and President of First State Community Bank, Bonne Terre were in attendance at the inauguration ceremony where attendees were invited to tour the new facility. They were joined by Chauncy Buchheit, Executive Director at SEMO RPC and Trelleborg representatives; Director of Operations, Rob Brockway, Finance Director, Robert Peacock and Plant Manager, Ed Sutton.

St. Francois County Commissioners, Bonne Terre Officials, Chamber of Commerce members and Sargent Construction representatives, were also present.




For more information, please go to:
www.trelleborg.com/pipeseals 
 

Press Service:
This press release is available for download in English. If you reproduce information from this release please give contact details as:
www.trelleborg.com
E-mail: news@trelleborg.com