Svenska
All Trelleborg Websites
Search
Home
About Us
Environment
Careers in Trelleborg
Products and Solutions
Checker®
Checker® Stud
Industrial Checker®
Industrial Checker® Stud
Trelleborg SoftWalk
Installation/maintenance
Chemical resistance
Environmental Declarations
Download our brochures
FAQ
Contact
Home
/
Products and Solutions
/
Installation/maintenance
Related Information
Download our Brochures
Contacts
Products and Solutions
Checker®
Checker® Stud
Industrial Checker®
Industrial Checker® Stud
Trelleborg SoftWalk
Installation/maintenance
Chemical resistance
Environmental Declarations
Download our brochures
Installation/maintenance
Most of Trelleborgs rubber flooring can be made both with and without polyester felt backing. The felt makes it possible for the flooring to be installed with environmentally friendly, water-based adhesive making protective gear unnecessary. Flooring without polyester felt backing is only recommended when the floor is loose laid. When wet-gluing a flooring with felt backing it's just to apply the adhesive with a trowel on the sub-floor, lay the flooring and press hard, preferably with a flooring roller. Then you have the possibility to adjust the flooring as long as the adhesive hasn't dried.
A floor layer should always be consulted in order to get the best possible solution for each specific installation.
Download our installation or maintenance instructions here:
Installation instructions for Checker and Checker Stud [pdf]
Maintenance instructions for all our flooring [pdf]
Last updated 2011-11-24 |
Print this page
|
E-mail this page
Facebook
Twitter
E-mail this page
x
Receiver e-mail address
Your e-mail address
Subject
Your message