Contact
Iain Tait
Sales and Marketing Director
tel: +44 (0) 1423 862677
fax: + 44 (0) 1423 868340







Ballast Systems

  
Marine - GRP Ballast Systems
Trelleborg Energy Control Products were awarded the contract to provide a complete Turn-Key solution for GRP Ballast System Pipework for HM Ships Albion & Bulwark LPD(R).

Working with BAE SYSTEMS Design Engineers a complete, fit for purpose, GRP Ballast System was successfully supplied and installed. The installation included 400 field closures per ship and the fitting of an 812mm diameter distribution manifold.

Ballast Systems are designed to transport sea water in and out of ballast tanks. These tanks are located towards the rear of the craft. This allows Landing Platform Dock (LPD) vessels to be raised and lowered in the water. The dock is flooded by filling ballast tanks; this is achieved by a careful controlled combination of pumping and equalisation with the external hydrostatic head. This allows the rapid ingress and egress of craft and troops from the vessel.

HMS Albion and HMS Bulwark are completed and fully operational.

Design parameters:
  • A30 rated when system ‘charged’
  • Ballast down within specified time frame
  • Pipework bores from 6” to 30”
  • Provide anchor and support drawings
  • Exceed requirements for shock and loading
  • 5 Bar pressure operating system
  • Flow hot spot of 11 Metres per second

 

Last updated 2007-09-21 |  Print this page Print this page |  E-mail this page E-mail this page
E-mail this pagex


Receiver e-mail address


Your e-mail address


Subject


Your message




uiqt|wBqiqv5|iq|H|zmttmjwzo5kwuqiqv5|iq|H|zmttmjwzo5kwu